Test methods and equipment for micro module, cold channel, hot channel data center and intelligent integrated cabinet

Update:24-03-2023
Summary:

Test methods and equipment for micro module, cold chann […]

Test methods and equipment for micro module, cold channel, hot channel data center and intelligent integrated cabinet

Test methods and equipment for micro module, cold channel, hot channel data center and intelligent integrated cabinet
1 Micromodule, cold channel, hot channel data center, intelligent integrated cabinet test environment
Unless otherwise specified, the test shall be conducted under the following normal atmospheric conditions:
a) Temperature: 15 ℃~35 ℃;
b) Relative humidity: 25%~75%;
c) Atmospheric pressure: 86kPa~106 kPa.
2 Energy efficiency test of Yipin technology micro module, cold channel, hot channel data center and intelligent integrated cabinet
2.1 Test equipment
Power meter: accuracy is 0.5.

fiber raceway,fiber duct,fiber tray,wire mesh cable tray,basket cable tray,cable tray,cable ladder,seismic bracing,cold aisle containment,hot aisle containment, server rack, network cabinet,plinth, anti-static raised floor, access floor, smart rack, modular data center,small data center

2.2 Measurement position
Requirements for measuring location of power consumption meter in modular data center are as follows:
a) The measuring point of total power consumption shall be the sum of the electric energy consumption of measuring point A and measuring point B in Figure 1 before the electric energy is input into the distribution device;
b) The measuring position of the power consumption of the electronic information equipment in the modular data center is the power supply circuit at the output end of the uninterruptible power supply (such as the uninterruptible power supply system, the high-voltage DC power supply system, etc.), that is, the measuring point C in Figure 1;
c) When the cabinet fan is used as auxiliary cooling, the measuring position of the power consumption of the electronic information equipment in the modular data center shall be the load power supply circuit of the electronic information equipment, that is, the measuring point E in Figure 1;
d) The cooling system, lighting system, monitoring system and other auxiliary equipment serving the electronic information equipment of the modular data center shall be provided with electric energy measurement, and the electric energy measurement points shall be set in the corresponding circuits of the distribution system. The summary is expressed as measuring points F, G and H, which can be used to analyze the power consumption of each part

fiber raceway,fiber duct,fiber tray,wire mesh cable tray,basket cable tray,cable tray,cable ladder,seismic bracing,cold aisle containment,hot aisle containment, server rack, network cabinet,plinth, anti-static raised floor, access floor, smart rack, modular data center,small data center